Skagit Public Utility District
Home MenuProject Bid Documents
Trumpeter Court Driveway Project
Notice is hereby given that Public Utility District No. 1 of Skagit County (Skagit PUD) will receive sealed Bids for the Trumpeter Court Driveway Project. Each bid shall be placed in a sealed envelope and shall be mailed or delivered to Skagit PUD’s office, Attn: Catherine Price, Contract Coordinator, 1415 Freeway Drive, Mount Vernon, Washington 98273, to arrive no later than 10 a.m., November 13, 2024. All complete bids will be opened and publicly read immediately following.
Trumpeter Court Driveway Project
Removal and replacement of an existing driveway consisting of approximately 686 square feet of exposed aggregate concrete that is approximately four inches thick except the area that falls within the city’s right of way that is six inches thick, preparation for the finish grading of the subgrade, and installation of the concrete driveway with the exposed aggregate as the finish.
The location of the proposed work is 3706 Trumpeter Court, Mount Vernon, WA 98273.
To request a copy of the bid packet, please email price@SkagitPUD.org or call (360) 848-4472, Contract Coordinator Catherine Price,
Skagit PUD is committed to a program of equal opportunity. Minority and women owned businesses are encouraged to apply.
Cherokee Lane Paving Project
Notice is hereby given that Public Utility District No. 1 of Skagit County (Skagit PUD) will receive sealed Bids for the Cherokee Lane Paving Project. Each bid shall be placed in a sealed envelope and shall be mailed or delivered to Skagit PUD’s office, Attn: Catherine Price, contract coordinator, 1415 Freeway Drive, Mount Vernon, Washington 98273, to arrive no later than 10 a.m., October 1, 2024. All complete bids will be opened and publicly read immediately following.
Cherokee Lane Paving Project
Finish grading of subgrade and installation of approximately 100 tons of final pavement surfacing, including joint sealing of base road repair conducted by PUD crews, as required by the city of Mount Vernon in the area depicted on the project plans.
The location of the proposed work on Cherokee Lane, Mount Vernon, WA 98273.
To request a copy of the bid packet please email price@SkagitPUD.org or call (360)848-4472, Catherine Price, contract coordinator.
Engineer's construction range: $50,000
North Burlington Pipeline Replacement Project
Notice is hereby given that Public Utility District No. 1 of Skagit County (Skagit PUD) will receive sealed Bids for the North Burlington Pipeline Replacement Project. Each bid shall be placed in a sealed envelope and shall be mailed or delivered to Skagit PUD's office, Attn: Chris Shaff, P.E., capital project engineer, 1415 Freeway Drive, Mount Vernon, Washington 98273, to arrive no later than 10 a.m., Friday, August 23, 2024. All complete bids will be opened and publicly read immediately following.
North Burlington Pipeline Replacement Project
Installation of approximately 7,550 linear feet of water distribution piping along Hazel Avenue, North Walnut Street, Avon Avenue, Magnolia Avenue, North Oak Street, North Cherry Street, North Pine Street, North Anacortes Street, South Walnut Street, and South Alder Street in the City of Burlington, State of Washington, consisting of 8-inch, diameter Ductile Iron piping including fittings, thrust blocks, service connections, fire hydrants, branch and mainline valves, establishment of private water service connections, dewatering, appurtenances and incidentals, pavement repair, abandonment of existing valves in place, temporary traffic control, temporary erosion control, disinfection, and pressure testing, in estimated quantities identified in the Bid Proposal and as shown on the plans.
North Burlington Pipeline Replacement Project –
Technical Specifications
North Burlington Pipeline Replacement Project – Plan Drawings
North Burlington Pipeline Replacement Project – Addendum No. 1
North Burlington Pipeline Replacement Project – Addendum No. 2
Water Treatment Plant Auxiliary Entrance Gate Automation Project
Notice is hereby given that Public Utility District No. 1 of Skagit County (Skagit PUD) will receive sealed bids for the Water Treatment Plant Auxiliary Entrance Gate Automation Project. Each bid shall be placed in a sealed envelope and shall be mailed or delivered to Skagit PUD’s office, Attn: Catherine Price, Contract Coordinator, 1415 Freeway Drive, Mount Vernon, Washington 98273, to arrive no later than 10:00 a.m., August 15, 2024. All complete bids will be opened and publicly read immediately following.
WTP Auxiliary Entrance Gate Automation Project
Modification of existing entrance gate to include mechanical opener, along with automation, set as a two-step operation transmitter: one to open transmitter, and one to close.
The location of the proposed work is 11932 Morford Road, Sedro-Woolley, WA 98284.
To request a copy of the bid packet, please email price@SkagitPUD.org or call (360) 848-4472, Catherine Price, contract coordinator.
Fiber Optic Campus to WTP: BNSF RR Crossing Project
Notice is hereby given that Public Utility District No. 1 of Skagit County (Skagit PUD) will receive sealed Bids for the Fiber Optic Campus to WTP: BNSF RR Crossing Project. Each bid shall be placed in a sealed envelope and shall be mailed or delivered to Skagit PUD’s office, Attention: Catherine Price, contract coordinator, 1415 Freeway Drive, Mount Vernon, Washington 98273, to arrive no later than 10:30 a.m., July 30, 2024. All complete bids will be opened and read immediately following.
Fiber Optic Campus to WTP: BNSF RR Crossing Project
Installation of approximately 167.5 linear feet of 2-inch HDPE fiber optic conduit by horizontal direction drill under the BNSF railroad crossing on Riverside Drive in Mount Vernon, Washington. Work includes pre-drilling geotechnical exploration boring and traffic control along with incidentals and appurtenances in estimated quantities identified in the Bid Proposal.
A Pre-Bid Meeting will be held at 10 a.m. on July 23, 2024, in the Aqua Room of Skagit PUD’s Mount Vernon office complex at 1415 Freeway Drive, Mount Vernon, Washington.
An unofficial bid set can be viewed at Skagit PUD’s office located at 1415 Freeway Drive, Mount Vernon, Washington 98273, or on PUD’s website www.SkagitPUD.org. Construction plans, specifications, addenda, and plan holders list for this project can be viewed or purchased on-line through Builders Exchange of Washington, Inc., at http://www/bxwa.com; 2607 Wetmore Avenue, Everett, WA 98201-2929, (425) 258-1303, Fax (425) 259-3832. Click on: “bxwa.com”; “Posted Projects”; “Public Works”, “PUD #1 of Skagit County” and “Projects Bidding”. (Note: Bidders are encouraged to “Register as a Bidder” in order to receive automatic e-mail notification of future addenda and to be placed on the “Bidders List”. This service is provided free of charge to Prime Bidders, Subcontractors and Vendors bidding this project. Contact Builders Exchange of Washington at (425) 258-1303, should you require further assistance). Contract documents will be available on or after July 09, 2024.
Point of Contact: Catherine Price, Contract Coordinator
The Engineer’s Estimate for Skagit PUD’s Fiber Optic Campus to WTP: BNSF Railroad Crossing Project is $50,000-$70,000.
Fiber Optic Campus to WTP: BNSF RR Crossing Project – Technical Specifications
Fiber Optic Campus to WTP: BNSF RR Crossing Project – Plan Drawings
Fiber Optic Campus to WTP: BNSF RR Crossing Project – Addendum No. 1
Fiber Optic Campus to WTP: BNSF RR Crossing Project – Bid Tabulations
Pipeline Relocation on SR-20 at Olson Creek and Pipeline Relocation at SR-9 North of Kalloch Road Projects
Schedule A: Pipeline Relocation on SR-20 at Olson Creek Project
Installation of approximately 610 linear feet of 16-inch HDPE casing by horizontal direction drill, installation of approximately 610 linear feet of 8-inch fused PVC C900 carrier water pipeline under Olson Creek, as well as installation of approximately 290 linear feet of 8-inch PVC water pipeline by traditional trenching methods along State Route 20, east of Ranger Station Road, Marblemount, State of Washington. Work includes valves, fittings, traffic control, and pressure and purity testing of the pipe, along with incidentals and appurtenances, such as casing spacers, end seals, grouting, dewatering, in estimated quantities identified in the Bid Proposal.
Schedule B: Pipeline Relocation at SR-9 North of Kalloch Road Project
Installation of approximately 500 linear feet of 16-inch HDPE casing by horizontal direction drill, installation of approximately 500 linear feet of 8-inch fused PVC C900 carrier water pipeline under a tributary of Hansen Creek along State Route 9, north of Kalloch Road, Sedro-Woolley, State of Washington, including valves, fittings, traffic control, and pressure and purity testing of the pipe, along with incidentals and appurtenances such as casing spacers, end seals, grouting, dewatering, in estimated quantities identified in the Bid Proposal.
A Pre-Bid Meeting will be held at 10 a.m. on Tuesday, January 9, in the Aqua Room of Skagit PUD’s Mount Vernon office complex at 1415 Freeway Drive, Mount Vernon, Washington.
Bid opening at 11 a.m., Thursday, January 18, 2024.
Pipeline Relocation on SR-20 at Olson Creek and Pipeline
Pipeline Relocation at SR-9 North of Kalloch Road Projects – Technical Specifications
Schedule A: Pipeline Relocation on SR-20 at Olson Creek – Plan Drawings
Schedule B: Pipeline Relocation at SR-9 North of Kalloch Road Projects – Plan Drawings
Pipeline Relocation on SR-20 at Olson Creek and Pipeline Relocation at SR-9 North of Kalloch Road Projects – Addendum No. 1
Pipeline Relocation on SR-20 at Olson Creek and Pipeline Relocation at SR-9 North of Kalloch Road Projects – Addendum No. 2
Pipeline Relocation on SR-20 at Olson Creek and Pipeline Relocation at SR-9 North of Kalloch Road Projects – Bid Tabulations
West Mount Vernon Pipeline Replacement Project
Installation of approximately 2,966 linear feet of water distribution piping along North Wall Street, Cosgrove Street, West Lincoln Street and North Barker Street in the city of Mount Vernon, state of Washington, consisting of 8-inch diameter PVCO C-909 piping including fittings, thrust blocks, service connections, fire hydrants, branch and mainline valves, establishment of private water service connections, pavement repair, temporary traffic controls, temporary erosion controls, disinfection, pressure testing, appurtenances and incidentals, such as abandonment of existing valves in place, dewatering, and landscape and surface restoration, in estimated quantities identified in the Bid Proposal and as shown on the plans.
The location of the proposed work is shown on the project plans.
A Pre-Bid Meeting will be held at 10 a.m. on Thursday, December 14, 2023, in the Aqua Room of Skagit PUD’s Mount Vernon office complex at 1415 Freeway Drive, Mount Vernon, Washington.
Bid opening at 10 a.m., Wednesday, December 20, 2023.
West Mount Vernon Pipeline Replacement Project – Technical Specifications
West Mount Vernon Pipeline Replacement Project – Plan Drawings
West MV Pipeline Replacement Project – Addendum No. 1
West MV Pipeline Replacement Project – Addendum No. 2
West MV Pipeline Replacement Project – Addendum No. 3
West Mount Vernon Pipeline Replacement Project - Bid Tabulations
Skagit Country Club Pipeline Replacement Project
Installation of approximately 11,600 linear feet of water distribution piping along Rainier Drive, Eagle Drive, Fairway Drive, and Country Club Drive, in Skagit County, state of Washington, consisting of 8-inch, 6-inch and 4-inch diameter PVCO C-909 and Ductile Iron piping including fittings, thrust blocks, service connections, fire hydrants, branch and mainline valves, establishment of private water service connections, pavement repair, temporary traffic controls, temporary erosion control, disinfection, pressure testing, appurtenances and incidentals, such as abandonment of existing valves in place, dewatering, and landscape and surface restoration in estimated quantities identified in the Bid Proposal and as shown on the plans.
Bid opening 10 a.m., Wednesday, November 15, 2023.
Skagit Country Club Pipeline Replacement Project – Technical Specifications
Skagit Country Club Pipeline Replacement Project – Plan Drawings
Skagit Country Club Pipeline Replacement Project - Addendum No. 1
Skagit Country Club Pipeline Replacement Project - Addendum No. 2
Skagit PUD Replacement Administration Building – Addendum No. 3
Skagit PUD Replacement Administration Building – Addendum No. 2
Skagit PUD Replacement Administration Building – Addendum No. 1
To All Planholders and/or Prospective Bidders:
The date and time of bidding have changed to 1 p.m. and 2 p.m., Tuesday, June 27, 2023, for Bid Forms “A” and “B,” respectively.
Skagit PUD Replacement Administration Building – Bid Requirements and Technical Specifications
PN 3675
The sealed Bid Proposal Form A and Bid Bond Form will be received at the engineering counter in Skagit PUD’s main lobby at 1415 Freeway Drive, Mount Vernon, WA 98273, until 1p.m. Pacific Daylight Time on Tuesday, June 27, 2023. The Bid Proposal Form B and other required attachments will be accepted until 2 p.m. PDT, one hour after the submission time for Form A.
Skagit PUD Replacement Administration Building – Bid Set
Little Mountain Sky Ridge Road Pipeline Project - Bid Tabulation
Bid Opening: December 16, 2022
Little Mountain Sky Ridge Road Pipeline Project - Design Drawings
The Engineer’s Estimate is $1,500,000 and $1,800,000.
Project No. 3484
CO: 4791
Bid Date: 10 a.m. PDT, December 16, 2022
Little Mountain Sky Ridge Road Pipeline Project - Technical Specs
Installation of approximately 3,770 linear feet of water distribution piping along Sky Ridge Road and Olympic Place from Blodgett Road to Olympic Place, Skagit County, Wash.
Gilligan Creek Road Slide Repair at Intake - Bid Tabulation
Bid Opening, August 18, 2022
Gilligan Creek Road Slide Repair at Intake Project - Addendum No. 1
All bidders shall acknowledge receipt and acceptance of this Addendum No. 1 in the bid form. Bid forms submitted without acknowledgment will be considered in non-conformance.
Driver Street & Satterlee Road Projects - Bid Tabulation
Driver Street: Satterlee Road to Caddy Street, Pipe Replacement and Satterlee Road: Gibralter Road to Driver Street, Phase I
Bid Opening, August 12, 2022
Driver Street: Satterlee Rd to Caddy St & Satterlee Road: Gibralter Rd to N Green St Projects – Addendum No. 2
All bidders shall acknowledge receipt and acceptance of this Addendum No. 2 in the Bid Form. Bid Forms submitted without acknowledgment will be considered in non-conformance.
Driver Street: Satterlee Rd to Caddy St & Satterlee Road: Gibralter Rd to N Green St Projects – Addendum No. 1
All bidders shall acknowledge receipt and acceptance of this Addendum No. 1 in the Bid Form. Bid forms submitted without acknowledgment will be considered in non-conformance.
Gilligan Creek Road Slide Repair at Intake Project - Technical Specifications
Shoulder repair and slope stabilization at Skagit PUD’s Gilligan Creek surface water intake, per the attached plans and specification sheet. Includes installation of three rows of 15- to 25-footlong rock dowels with anchored steel mesh to stabilize the existing slope, construction of two and three rows of gabion baskets in the upper portion of the slope to retain shoulder fill, and installation of a rock dowel supported ships ladder with upper landing (per Washington Administrative Code (WAC) 296-876-60015 Notes 1 and 2).
Work also includes road excavation at a secondary location in close proximity to the above-described work. Road excavation will be mostly unclassified excavation and paid for via Force Account Work where approximately 100 feet of the roadway will be shifted 3 to 4 feet into the ditch line (away from the failure).
The location of the proposed work is five miles east of Highway 9 off Old Day Creek Road, south of South Skagit Highway.
Gilligan Creek Road Slide Repair at Intake Project - Design Drawings
The engineer’s estimate is $215,644.
Project No. 3817
CO: 5085
Bid Date: 10 a.m. PDT, August 18, 2022
Driver Street & Satterlee Road Projects - Technical Specs
Driver Street: Satterlee Road to Caddy Street Pipe Replacement Project
Installation of approximately 455 linear feet of water distribution piping along Driver Street from Satterlee Road to Caddy Street and along Caddy Street from Driver Street, Skagit County, State of Washington, consisting of 8-inch diameter PVC C-900 piping including fittings, thrust blocks, service connections, fire hydrants, branch, and mainline valves, establishment of private water service connections, clearing and grubbing, dewatering, appurtenances and incidentals, pavement repair, abandonment of existing valves in place, temporary traffic control, temporary erosion control, disinfection, and pressure testing, in estimated quantities identified in the Bid Proposal and as shown on the plans.
Satterlee Road: Gibralter Road to Driver Road Phase I
Salvaging and relocating an existing PRV vault and the installation of approximately 1,550 linear feet of water distribution piping along Satterlee Road from Gibralter Road to North Green Street, Skagit County, State of Washington, consisting of 8-inch diameter PVC C-900 piping including fittings, thrust blocks, service connections, fire hydrants, branch and mainline valves, establishment of private water service connections, dewatering, appurtenances and incidentals, pavement repair, abandonment of existing valves in place, temporary traffic control, temporary erosion control, disinfection, and pressure testing, in estimated quantities identified in the Bid Proposal and as shown on the plans.
Work is divided between two (2) bid schedules under one contract.
Driver Street & Satterlee Road - Appendices
The Driver Rd and Satterlee Rd engineer’s estimate for both schedules A & B combined is $470,000 to $630,000.
Project No. 3834
CO: 5101
Project No. 3505
CO: 4811
Driver Street, Satterlee Road to Caddy Street, Pipe Replacement Project - Design Drawings
The Driver Street and Satterlee Road engineer’s estimate for both schedules A & B combined is $470,000 to $630,000.
Project No. 3834
CO: 5101
Bid Date: 10 a.m. PDT, August 12, 2022
Satterlee Road, Gibralter Road to Driver Street, Phase I - Design Drawings
The Driver Street and Satterlee Road engineer’s estimate for both schedules A & B combined is $470,000 to $630,000.
Project No. 3505
CO: 4811
Bid Date: 10 a.m. PDT, August 12, 2022
Burkland Road, East Stackpole Road to East Johnson Road Project - Bid Tabulation 2021.07.30
Bid Opening, July 30, 2021
Burkland Road, East Stackpole Road to East Johnson Road Project - Addendum No. 1
The following changes, additions, and/or deletions are hereby made a part of the project bid documents for the Burkland Road, East Stackpole Road to East Johnson Road Project and shall have the same effect as if set forth therein.
Project No. 3514
CO: 4820
Bid Date: 10 a.m. PDT, July 30, 2021
Burkland Road, East Stackpole Road to East Johnson Road Project - Design Drawings
The Engineer’s Estimate is $2.3-2.8 Million.
Project No. 3514
CO: 4820
Bid Date: 10 a.m. PDT, July 30, 2021
Burkland Road, East Stackpole Road to East Johnson Road Project - Technical Specifications
Installation of approximately 14,100 linear feet of water distribution piping along Burkland Road from East Stackpole Road to East Johnson Road, along John Nelson Road from Burkland Road to Cedardale Road, and along Cedardale Road from John Nelson Road to State Route 534, Skagit County, State of Washington, consisting of 12-inch and 6-inch diameter Class 50 Ductile Iron and Horizontal Directional Drilled 14-inch HDPE piping including fittings, thrust blocks, service connections, fire hydrants, branch, and mainline valves, establishment of private water service connections, dewatering, appurtenances and incidentals, pavement repair, abandonment of existing valves in place, temporary traffic control, temporary erosion control, disinfection, and pressure testing, in estimated quantities identified in the Bid Proposal and as shown on the plans.
The work in the Contract will also consist of the installation of approximately 14,100 linear feet of 4-inch HDPE SDR11 fiber conduit in the same trench as the water distribution piping as identified in the Bid Proposal and as shown on the plans. Fiber optic cable will be installed at a later date.
The Engineer’s Estimate is $2.3-2.8 Million.
Project No. 3514
CO: 4820
Bid Date: 10 a.m. PDT, July 30, 2021
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Bid Tabulation
Bid Opening, January 29, 2021
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Addendum No. 4 Final
To All Planholders and/or Prospective Bidders:
The following changes, additions, and/or deletions are hereby made a part of the project bid documents for the Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 and shall have the same effect as if set forth therein. Receipt of this Addendum must be acknowledged on your Bidder’s Proposal form. Failure to acknowledge receipt of this Addendum may result in your bid proposal being disqualified.
Project No. 3549
CO: 4385
Bid Opening: January 29, 2021
The engineer’s estimate range for Project # 3549 is $26 - $33 million.
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Addendum No. 3
To All Planholders and/or Prospective Bidders:
The following changes, additions, and/or deletions are hereby made a part of the project bid documents for the Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 and shall have the same effect as if set forth therein. Receipt of this Addendum must be acknowledged on your Bidder’s Proposal form.
Bidder question cut off is Friday, January 22, 2021, at 5 p.m. Bidder questions after this deadline will not be addressed.
Project No. 3549
CO: 4385
Bid Opening: January 29, 2021
The engineer’s estimate range for Project # 3549 is $26 - $33 million.
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Addendum No. 2
Project No. 3549
CO: 4385
The engineer’s estimate range for Project # 3549 is $26 - $33 million.
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Addendum No. 1
Project No. 3549
CO: 4385
The engineer’s estimate range for Project # 3549 is $26 - $33 million.
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Bored and Jacked Casings Specifications
This Section specifies jacked casings, installation of carrier pipe in the casing, and installation of end seals. Work includes jacking of casings up to 48 inches in diameter for the water transmission pipeline and 18 inches in diameter for the water distribution line.
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Pipe Alignment Drone Video
Full flight from the south connection point of the transmission line to the Judy Reservoir water treatment plant.
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Technical Specifications
Project No. 3549
CO: 4385
Installation of water transmission and distribution piping and services within the right-of-way and private property within the city of Mount Vernon and unincorporated Skagit County. The water transmission pipeline is 36 inches in diameter and is approximately 5.3 miles long.
The engineer’s estimate range for Project # 3549 is $26 - $33 million.
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Appendices
Project No. 3549
CO: 4385
The engineer’s estimate range for Project # 3549 is $26 - $33 million.
Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Design Drawings
Project No. 3549
CO: 4385
The engineer’s estimate range for Project # 3549 is $26 - $33 million.
Judy Reservoir Raw Water Pump Station Replacement Project - Bid Tabulation
Bid Opening: November 3, 2020
Judy Reservoir Raw Water Pump Station Replacement Project - Addendum No. 3
Project No. 3766
Bid Opening: November 3, 2020
The engineer’s estimate range for Project # 3766 is $3 - 3.2 million.
Judy Reservoir Raw Water Pump Station Replacement Project - Addendum No. 2
Project No. 3766
Bid Opening: November 3, 2020
The engineer’s estimate range for Project # 3766 is $3 - 3.2 million.
Judy Reservoir Raw Water Pump Station Replacement Project - Addendum No. 1
Project No. 3766
Bid Opening: November 3, 2020
The engineer’s estimate range for Project # 3766 is $3 - 3.2 million.
Judy Raw Water Pump Station Replacement Project - Plans
Project No. 3766
Bid Opening: October 20, 2020
The engineer’s estimate range for Project # 3766 is $3 - 3.2 million.
Judy Raw Water Pump Station Replacement Project - Technical Specifications
Project No. 3766
Bid Opening: October 20, 2020
Installation of a new raw water pump station with three vertical turbine pumps, split-faced CMU building, metal roof, and associated mechanical appurtenances, electrical equipment, and heating and cooling systems. Site improvements include water yard piping, storm drain modification, chain-link fence, site lighting, final grading, surface restoration, and landscaping restoration.
The engineer’s estimate range for Project # 3766 is $3 - 3.2 million.
N 18th St, E Division St to Highland Ave and E Fir St, N LaVenture Rd to N 30th St Project - Bid Tabulation
- N 18th St, E Division St to Highland Ave and E Fir St, N LaVenture Rd to N 30th St Project - Addendum 2
- N 18th St, E Division St to Highland Ave and E Fir St, N LaVenture Rd to N 30th St Project - Addendum 1
Project # 3760
C.O. # 5037
N 18th St, E Division St to Highland Ave and E Fir St, N LaVenture Rd to N 30th St Project - Bid Plans
Bid Opening is August 19, 2020.
The Engineer’s Estimate range for Project # 3760 is $1.5-1.8 million.
N 18th St, E Division St to Highland Ave and E Fir St, N LaVenture Rd to N 30th St Specifications and Bid Documents
Project # 3760
C.O. # 5037
Mountain View Road Pipeline Project - Bid Tabulation
Bid Opening January 8, 2020
Mountain View Road Pipeline Project - Addendum No. 2
Project # 3672
C.O. # 4963
Mountain View Road Pipeline Project - Addendum No. 1
Project # 3672
C.O. # 4963
Mountain View Road Pipeline Project - Drawings
Project # 3672
C.O. # 4963
Mountain View Road Pipeline Project - Technical Specifications
Mountain View Road Pipeline Project (#3673)
Installation of approximately 5,300 linear feet of water distribution piping along East Division/Mount Vernon Big Lake Road and along Mountain View Road, Skagit County, State of Washington, consisting of 12-inch C909 PVCO and 3-inch PVC water distribution piping including fittings, thrust blocks, service connections, fire hydrants, branch and mainline valves, establishment of private water service connections, dewatering, appurtenances and incidentals, pavement repair, temporary traffic control, temporary erosion control, disinfection, and pressure testing and site restoration, in estimated quantities identified in the Bid Proposal and as shown on the plans.
The work in the Contract will also consist of the installation of approximately 5,300 linear feet of 4-inch HDPE IPS SDR11 fiber conduit in the same trench as the water distribution piping as identified in the Bid Proposal and as shown on the plans. Fiber optic cable will be installed at a later date.
Ranney Well Decommission Project - Bid Tabulation
Bid Opening: June 28, 2019
Ranney Well Decommission Addendum No. 1
C.O. #972
Ranney Well Decommission Project Drawings
C.O. #972
Ranney Well Decommission Specifications and Bid Documents
C.O. #972
McLean Road, Wall Street to Best Road, Phase II - Addendum 1
McLean Road, Wall Street to Best Road, Phase II
Project #3761
Daisy Lane Stream Crossing
Project # 3733
Bid Opening: June 18, 2019
McLean Road, Wall Street to Best Road, Phase II - Plans
Bid Opening: June 18, 2019
The Engineer’s Estimate for the McLean Road, Wall Street to Best Road Phase II, and Daisy Lane Stream Crossing is between $2,000,000.00 and $2,300,000.00.
McLean Road, Wall Street to Best Road, Phase II - Technical Specifications
McLean Road, Wall Street to Best Road, Phase II
Project #3761
Daisy Lane Stream Crossing
Project # 3733
Bid Opening: June 18, 2019
The Engineer’s Estimate for the McLean Road, Wall Street to Best Road Phase II, and Daisy Lane Stream Crossing is between $2,000,000.00 and $2,300,000.00.
Conway I-5 Pipeline Crossing Project: Re-Bid Tabulation
Re-Bid Tabulation: March 12, 2019
Conway I-5 Pipeline Crossing Project - Drawings
Re-Issued for Bidding
Project #3707: Conway I-5 Pipeline Crossing Drawings
Conway I-5 Pipeline Crossing Project - Technical Specifications
Issued for Re-Bidding
The Conway I-5 Crossing Project consists of the following:
Installation of a 24-inch fused C900 PVC casing pipe using horizontal directional drilling technique under Interstate 5 north of the Conway/State Route 534 Interchange. Also, installation of a 12-inch fused C900 PVC potable water pipeline and a 3-inch HDPE fiber conduit, including fittings, casing spacers, end seals, grouting, appurtenances and incidentals, dewatering, guardrail removal and reinstallation, temporary traffic control, temporary erosion control, disinfection, and pressure testing, in estimated quantities identified in the Bid Proposal.
Conway I-5 Pipeline Crossing Project: Bid Tabulation
Bid Opening: February 20, 2019
Best Road, Rudene Road to Summers Drive, Project
Bid Opening: October 16, 2018